Project Type: Residential
Client: Harper Group
This residential development was started in the latter months of 2025 and handed back to our client who undertook the works on behalf of Wolverhampton Council in 2026.
Situated on a site the previously houses garages.
Foundation Type: Raft Slab
c. 2t on reinforcement to tie prior to the 300mm thick slab being shuttered and poured.
Drainage: New connections for both the foul and storm into the existing highway have taken place. Average depth of these runs was 1.90m deep.